What a nice job for a Friday morning!
Another asphalt patch installed by one of our hand-lay crews.
For a no obligation quotation, please get in touch via our contact us page.
This new model has benefits from:
OLR understand the need for high quality tools and invest heavily in making sure that our full inventory is continually refreshed.
We pride ourselves on providing a first quality service. A critical factor in achieving this is a continual plant and machinery investment program.
One of our asphalt hotbox patching crews has been busy in Birmingham, performing defect maintenance repair works for KIER Highways.
Our mobile asphalt hotbox’s enable us to use hot, in specification material all day. This allows a full shift of productive working for our client and a high quality finish for the public.
Keep up the good work lads.
This model can provide a highly efficient, single vehicle, cost effective patching solution.
For more information, please dont hesitate to get in touch.
For more information on our hire services, click the button below
We have multiple sites in the Cambridgeshire area over the next 6 months and have a quantity of high grade Tarmac Road Planings for sale.
Must have good access for an 8 wheel tipper.
Day and Night deliveries avalible.
For more information, price and availability, please call us.
Alternatively please use the following contact form and we will get back to you promptly.
We are working in Wisbech area in the next few weeks and have a quantity of high grade Tarmac Road Planings for sale.
Must have good access for an 8 wheel tipper.
Day and Night deliveries avalible.
For price and availability, please call us.
Alternatively please use the following contact form and we will get back to you promptly.
Recently completed resurfacing work at Cheriton Bishop village hall and Doctors surgery. The old surface removed and relaid with a durable surface course.
We have a large quantity of High Grade Road Planings available from various locations along the M6 Toll.
All deliveries would be made at night.
Must have good access for 8 wheel tipper.
Price is dependant on the quantity and distance from site.
Please click the button below for more information, or contact us via the website.
We have a large quantity of High Grade Road Planings available from a site close to the M5 Junction 6.
All deliveries would be made at night.
Must have good access for 8 wheel tipper.
Price is dependant on the quantity and distance from site.
Please click the button below for more information, or visit our website.
We are working in Peterborough area over the next few months and have a large quantity of high grade Tarmac Road Planings.
Deliveries may be during the day and also at night.
Must have good access for 8 wheel tipper.
Price is dependant on the quantity and distance from site.
Please click the link below for further information and we will send you a message. Or visit the website.
An example of our skid steer planer operators work. This job required profile planing to remove high spots in a binder course in preparation for the surface course.
This private residence was surfaced by OLR Services Ltd upon completion of all the exterior walls and gate installation. The client specifically requested no joints in the wearing course. This made the job challenging, the gang performed to there best of there ability and produced a lovely finished product. The client was extremely happy with the end result.
This was some radius kerbs installed on the entrance to a private driveway, prior to surfacing works.
Here we undertook the task of site clearance for a new client. This site required the removal of just over 800 tons of concrete flooring and slab, some reinforced with fibres and mesh.
Some of the concrete break out was put through a crusher on site to be used as a hard standing for building materials.
Once this was completed the whole site was levelled and raked over in preparation for building works to commence.
This project took just over 2 weeks to complete working within the confined hours of 9am-5pm Monday to Friday so as not to cause to much distress to local housing. All residents within the close proximity of the site were inf
rmed of the inevitable tool noise and working hours.
OLR Services Ltd was contracted in to landscape around this solar farm substation, this included installing a metre wide pathway around the substation for engineers to perform routine maintenance. The soil around the substation was then levelled and graded, then rolled to ensure a compact surface for future maintenance access to the panels. All soil areas landscaped were then reseeded upon completion.