• +07912 936 059
  • admin@olrservices.co.uk

OLR News

Nice Start to a Friday Morning

What a nice job for a Friday morning!

Another asphalt patch installed by one of our hand-lay crews.

For a no obligation quotation, please get in touch via our contact us page.

Investing in Quality Plant, to Achieve Quality Results

The importance of new and up to date equipment should be a crucial element to any business. With this in mind, we have just took delivery of a new Mecalac MBR71 Roller.

This new model has benefits from:

  • More ergonomic operator controls. This reduces fatigue on the operator and reduces HAVS exposure levels. The additional handle surround guards prevent a crush risk to the operators hands.
  • Electronic parking brake on the operator control arm. This ensures travel movement is prohibited prior to the operator releasing their grip.
  • Lower db levels through an improved engine design.
  • More efficient engine resulting in less fuel consumption and reduced emission outputs.
  • Plastic water tank to reduce the likelihood of freezing in cold weather conditions.

OLR understand the need for high quality tools and invest heavily in making sure that our full inventory is continually refreshed.

We pride ourselves on providing a first quality service. A critical factor in achieving this is a continual plant and machinery investment program.

Footway Defect Repairs

One of our asphalt hotbox patching crews has been busy in Birmingham, performing defect maintenance repair works for KIER Highways.

Our mobile asphalt hotbox’s enable us to use hot, in specification material all day. This allows a full shift of productive working for our client and a high quality finish for the public.

Keep up the good work lads.

All new Asphalt Hotbox Model

The all encompassing patch repair solution – The HB2RT

OLR Services is proud to display our latest model of asphalt hotbox for short or long term hire.

  • A Pedestrian Roller carrier on the front A Frame
  • Class leading carry capacity
  • Efficient Gas Fueled Burner
  • Chapter 8 Signage
  • LED Work Lights
  • 280 degree LED amber beacons
  • Wheel barrow carrier
  • Dual Bottle Carriers
  • Tool Rack
  • Shovel Holder

This model can provide a highly efficient, single vehicle, cost effective patching solution.


For more information, please dont hesitate to get in touch.

New Asphalt Hotbox

OLR Services have just taken delivery of a custom built Asphalt Hotbox for the hire fleet

This unit has been designed with efficiency in mind:
  • The heating system is a diesel burner unit, incorporating a fuel/air injection system with a digital thermostatic controller
  • An power efficient hydraulic tipping system allows a gravity feed of material to the two rear chutes. The ram is dual acting incorporating safety control valves to ensure no crush risk should the hydraulics fail
  • High output LED work lights assist in providing a safe working area during night works
  • Amber LED Beacons fitted on all sides ensure road users are aware of the activities

For more information on our hire services, click the button below

Cambridgeshire Planing Area

High Grade Road Planings for Sale in Cambridgeshire

We have multiple sites in the Cambridgeshire area over the next 6 months and have a quantity of high grade Tarmac Road Planings for sale.

Must have good access for an 8 wheel tipper.

Day and Night deliveries avalible.

For more information, price and availability, please call us.

Alternatively please use the following contact form and we will get back to you promptly.

Enquiry Form

Road Planings Wisbech

High Grade Road Planings for Sale in Wisbech

We are working in Wisbech area in the next few weeks and have a quantity of high grade Tarmac Road Planings for sale.

Must have good access for an 8 wheel tipper.

Day and Night deliveries avalible.

For price and availability, please call us.

Alternatively please use the following contact form and we will get back to you promptly.

Enquiry Form

Resurfacing for Cheriton Bishop Village Hall

Recently completed resurfacing work at Cheriton Bishop village hall and Doctors surgery. The old surface removed and relaid with a durable surface course.

High Grade Road Planings for Sale in Staffordshire

High Grade Road Planings for Sale in Shenstone and Weeford Area

We have a large quantity of High Grade Road Planings available from various locations along the M6 Toll.

All deliveries would be made at night.

Must have good access for 8 wheel tipper.

Price is dependant on the quantity and distance from site.

Please click the button below for more information, or contact us via the website.

Enquiry Form

 

High Grade Road Planings for Sale in Worcestershire

High Grade Road Planings for Sale in Worcestershire

We have a large quantity of High Grade Road Planings available from a site close to the M5 Junction 6.

All deliveries would be made at night.

Must have good access for 8 wheel tipper.

Price is dependant on the quantity and distance from site.

Please click the button below for more information, or visit our website.

Enquiry Form

High Grade Road Planings for sale in Peterborough

High Grade Road Planings for sale in Peterborough

We are working in Peterborough area over the next few months and have a large quantity of high grade Tarmac Road Planings.

Deliveries may be during the day and also at night.

Must have good access for 8 wheel tipper.

Price is dependant on the quantity and distance from site.

Please click the link below for further information and we will send you a message. Or visit the website.

Contact Us

Another Drop Crossing Completed

Today we completed another drop crossing for a returning customer.

Motorway Nightworks

Suppling on site supervision services to one of our supply chain clients.

Skidsteer Planer Operator Hire

An example of our skid steer planer operators work. This job required profile planing to remove high spots in a binder course in preparation for the surface course.


Planed Surface

Planed Surface

Laying ducting

After a very wet December, OLR was out in a short dry spell of weather to install some cable ducting ahead of a looming deadline for Western Power. With only a small window to get the the trench dug and reinstated it was all hands on to complete the task. 420 metres was installed in 3 days.

Private Driveway

This private residence was surfaced by OLR Services Ltd upon completion of all the exterior walls and gate installation. The client specifically requested no joints in the wearing course. This made the job challenging,  the gang performed to there best of there ability and produced a lovely finished product. The client was extremely happy with the end result.

tarmac


P1000421


kerb

Radius Kerbing

This was some radius kerbs installed on the entrance to a private driveway, prior to surfacing worksRadius Kerbing.Radius Kerbing

Site Clearance

Here we undertook the task of site clearance for a new client. This site required the removal of just over 800 tons of concrete flooring and slab, some reinforced with fibres and mesh.

Site Clearance Site Clearance

 

 

 

 

 

 


Some of the concrete break out was put through a crusher on site to be used as a hard standing for building materials.

Once this was completed the whole site was levelled and raked over in preparation for building works to commence.

Completed Site Clearance

This project took just over 2 weeks to complete working within the confined hours of 9am-5pm Monday to Friday so as not to cause to much distress to local housing. All residents within the close proximity of the site were inf
rmed of the inevitable tool noise and working hours.

Completed Site Clearance Completed Site Clearance

Holiday Park Driveway Surfaced

oll1


Slider image

Solar Farm North Devon

OLR Services Ltd was contracted in to landscape around this solar farm substation, this included installing a metre wide pathway around the substation for engineers to perform routine maintenance. The soil around the substation was then levelled and graded, then rolled to ensure a compact surface for future maintenance access to the panels. All soil areas landscaped were then reseeded upon completion.
IMG_0007


IMG_0006


IMG_0008


IMG_0003


IMG_0004

1